Sunday 20 August 2017

Cutting Casting

The story of my modelling week has been casting a job lot of resin rocks for lining the massive cutting at the back of the layout.


I've made five molds using pieces of shale collected in the North Wales area over the years and I've made a few copies of each.

In order to give Himself more options when using them, in a mosaic fashion, to line the cutting I have cast a number of smaller pieces by pouring resin into only a small area of the mold.

One of our concerns is that it repeated patterns could be obvious in the rock walls so this should help him break it up a bit.

The reason we're doing this is because Cutting Mawr is so long and deep that to line it with real rock would make the baseboard very heavy and more awkward to carry and lift into place when the layout is exhibited.

Incidentally, the difference in the colour of some of the pieces is because half way through I moved onto using a new bottle of Isocyanat.